OFFICE DEVELOPMENTS AT E1.4 CENTRAL
MILTON KEYNES
|
|
ELEVATION
FACING M1 MOTORWAY. STRUCTURAL
FORM
STEEL FRAME WITH COMPOSITE PRECAST SUSPENDED FLOORS PILED FOUNDATIONS |
|
|
SIDE
ELEVATION GLASS BLOCK STAIR TOWERS WITH FULL HEIGHT CURTAIN WALLING TO THE M1 ELEVATION STACK BONDED MASONRY TO THE SIDE ELEVATION FEATURE TUBULAR STEEL FRAME TO BRISE SOLEIL. |
CLIENT ABBEYGATE
DEVELOPMENTS
CONTRACTOR JOHN SISK AND SONS LTD
VALUE £2.25 MILLION